TIANETI · Data Campus Tianeti · Georgia
000% Init site boundary

TIANETI_DC // GEORGIA // PHASE_I 5MW // STATUS: DEVELOPMENT

Building the AI infrastructure hub of the Caucasus.

A Tier III–design, liquid-cooling-ready AI & Telecom Data Campus between Europe and Central Asia. Five megawatts in Phase I, a twenty-megawatt master plan, carrier-neutral fibre and hydro-dominated power.

Aerial renderConcept
Aerial render of the Tianeti data campus halls in the Georgian highlands

Capacity

5 → 20 MW

Design

Tier III target

Grid

Hydro-dominated

Local time

--:--:-- GMT+4

01 · Total planned

20MW

02 · Phase I, AI-ready

5MW

03 · Rack density

30–80kW

04 · Design standard

Tier III

[01] Why TianetiSite thesis

Three things a campus cannot buy later.

01 / POSITION

Position

Tianeti sits on the land bridge between Europe, Turkey, the Middle East and Central Asia — seventy kilometres from Tbilisi, under three hours from Europe by fibre. A cool highland climate does part of the cooling for free.

02 / POWER

Power

Up to twenty megawatts of secured capacity on a dual-feed architecture, with an on-site substation planned, N+1 redundancy across all systems, and access to Georgia's hydro-dominated generation mix for lower-carbon positioning.

03 / CONNECTIVITY

Connectivity

A carrier-neutral campus on multiple diverse fibre routes, with low latency to Europe, Turkey, the Middle East and Central Asia — built to serve as a telecom, MVNO, roaming and SMS hub as readily as an AI hall.

AI hallInterior
Interior of a liquid-cooled AI hall with high-density racks

[02] Designed for the AI era

Dense compute, from the first rack.

Cooling
Liquid-cooling ready — CDU, water and heat-rejection design
Density
30–80 kW per rack, AI/HPC-optimised infrastructure
Power
Dual feed, on-site substation planned, backup generators and UPS
Redundancy
N+1 across all critical systems, Tier III design target
Scale
5 MW to 20 MW+ on a modular, gate-based expansion path
[03] Concept masterplanRev 03 · 03 Oct 2026 · Not to scale

Two parcels, one modular site.

Compute and cooling on parcel 73.05.23.083, power and operations on 73.05.23.001, with containerised 40-ft compute modules, dry coolers, MV/LV switchgear and an expansion zone held for later phases.

A · Compute & cooling

Parcel 73.05.23.083. Rows of 40-ft compute containers with dry coolers and CDUs alongside.

B · Power & operations

Parcel 73.05.23.001. Electrical equipment, reserved backup power, optional BESS and site operations.

C · Future expansion

Adjacent land subject to land rights, with a proposed power and fibre crossing to be confirmed.

Concept visualisation only. Equipment symbols and capacity ranges are illustrative planning assumptions, not fitted capacity. Survey, equipment fit, utility capacity and land rights are unverified.

Concept masterplan of the Tianeti AI data center: compute and cooling parcel, power and operations parcel, future expansion area, and typical compute module, cooling loop and service access diagrams Open full size ↗
[04] Technical specificationDesign targets

Phase I, in full.

Design parameters as specified for the 5 MW entry phase and the 20 MW master plan. All values are design targets pending independent certification.

ParameterPhase ITotal campusEvidence at diligence
IT load5 MW20 MWSingle-line power study and PUE design
Design standardTier III targetTier III targetUptime design and constructed-facility pathway
CoolingLiquid-cooling readyLiquid-cooling readyCDU, water and heat-rejection design
Rack density30–80 kW30–80 kWTenant mix and thermal model
Power redundancyN+1N+1Utility and generator redundancy study
Reserved capacity10 MW+ target40 MW+ targetBinding utility reservation
Power supplyDual feed, substation plannedSame architectureInterconnection schedule and capex
ConnectivityMultiple routesCarrier-neutralRoute diversity and IRUs
[05] Competitive positionMarket reference

Scale, density and an expansion path.

Georgia's commercial data-centre market is early-stage. Tianeti is positioned as a scaled AI/HPC campus and one of the country's early Tier III commercial assets — alongside, not instead of, Silknet's certified project now under construction for a 2027 target.

DimensionTianeti targetMarket reference
Initial IT load5 MWSilknet announced 2 MW
Campus expansionUp to 20 MWNascent local supply
Rack density30–80 kW per rackEnterprise facilities typically lower
CoolingLiquid-cooling readyAir-cooled legacy base
ConnectivityCarrier-neutral, multiple routesTo be contracted
CertificationTier III design targetSilknet targets Tier III certification

Tianeti claims remain project targets until independently certified. No first-mover claim is made while a certified competing project is under development.

[06] Strategic location

One site, five markets within a morning's drive.

  • Tbilisi70 km
  • Armenia110 km
  • Black Sea200 km
  • Turkey280 km
  • Azerbaijan350 km
  • Europe< 3 h by fibre
  • Pro-business government, tax advantages, and land, space and power availability for expansion at scale.
Regional reachSchematic
Schematic of Tianeti and its distance to Tbilisi, Armenia, the Black Sea, Turkey and Azerbaijan 100 KM200 KM300 KM N TIANETI TBILISI ARMENIA BLACK SEA TURKEY AZERBAIJAN EUROPE 70 km 110 km 200 km 280 km 350 km < 3 h by fibre SCHEMATIC · INDICATIVE BEARINGS

[07] Energy & sustainability

A hydro-dominated grid and a climate that cools for free.

Georgia generates the majority of its electricity from hydropower. Tianeti is designed to draw on that mix under contracted supply, with renewable-origin certificates verified rather than assumed — the campus targets a fully green-energy supply as capacity is contracted.

The highland site sits at altitude with long cool seasons, allowing extended free-cooling hours and a lower design PUE than a comparable lowland facility. Liquid cooling carries the dense AI racks; ambient air does the rest for much of the year.

100%

Green energy potential

Free

Cooling hours from climate

Dual

Feed with on-site substation

Hydro & transmissionHighlands
Hydropower dam and transmission lines in the Georgian highlands
[08] Investment case · Phase IHeadline figures only

A 5 MW entry phase designed for an institutional exit.

5 MW

Phase I IT load

20 MW

Campus master plan

$55–65M

Phase I investment

24 mo

Development to stabilisation

// Structure

Phase I is structured as a build-to-institutional-standard project: contracted capacity first, then a stabilised asset with audited operating evidence and transferable land, grid, fibre and licence rights. The capital plan, return scenarios and the distribution waterfall are set out in the investor memorandum and released under NDA.

Request the memorandum →

// Go / no-go gates

  • Land title and environmental baseline
  • Binding power capacity rights before EPC notice to proceed
  • Diverse fibre routes under contract
  • Anchor-tenant letter of intent
  • Fixed-price EPC with guaranteed maximum price

[09] Delivery roadmap

Twenty-four months, run in parallel.

01 · M1–3

Prepare

Feasibility, site control, utility study, lender package.

02 · M4–6

Close

Debt and insurance terms, permits, design, EPC award.

03 · M7–14

Build

Civil works, substation, equipment and fibre.

04 · M12–18

Lease

Anchor tenant contracts and commissioning.

05 · M18–20

Stabilise

Certification, occupancy and NOI evidence.

06 · M20–24

Exit

Advisor appointment, buyer diligence and closing.

[10] For whom we build

  • AI & HPC companies
  • Cloud & SaaS providers
  • Telecom & MVNO operators
  • Enterprises & banks
  • Government & public sector

[11] Revenue streams

  • AI GPU hosting & training infrastructure
  • Wholesale capacity & colocation
  • International fibre & cross-connect
  • Telecom hub, roaming & SMS
  • Managed services & disaster recovery
Compute demand is arriving in the region faster than resilient capacity is being built. Tianeti is our answer to that gap.
— Development thesis, Phase I
[12] Progress logLive

Where the project stands.

  1. Oct 2026

    Concept masterplan, revision 03

    Site layout across both parcels with preliminary capacity scenarios, equipment zones and an expansion area held for later phases.

  2. Sep 2026

    Investor business plan issued

    Version 3 of the Phase I plan completed, with the capital plan, delivery roadmap and risk register prepared for investor review.

  3. In progress

    Site control and utility study

    Land title, environmental baseline and the interconnection study are being assembled ahead of a binding capacity reservation.

  4. Next

    Anchor-tenant and lender engagement

    Letters of intent from AI, cloud and telecom counterparties, and a debt term sheet, are the gating conditions for financial close.

[13] Partnership & enquiriesNDA on request

Request the investor memorandum.

We are in discussion with investors, telecom and cloud partners, AI operators, energy suppliers, financial institutions and public bodies. Detailed financials are released under NDA.

// Reply within two business days

SiteTianeti, Georgia
Local time--:--:-- GMT+4